Clients


CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:DESIGN,SUPPLY,INSTALLATION,& COMMISSIONING OF LOW VOLTAGE,MEDIUM VOLTAGE & VARIABLE SPEED DRIVES (VFD) FOR KPC PS3 (MAUNGU)

This was an upgrade of the old Switchboard. The introduction of MV drives was a milestone benefit to the client as it helps in reducing the power cost and also improvement in operation which therefore results into efficiency.

CLIENT: PARLIAMENT OF KENYA


PROBLEM:SERVICE MAINTENANCE FOR STRUCTURED CABLING FOR VOICE AND DATA

Amacec through its dedicated staff at Parliament successfully provided support in the maintenance of the entire Parliamentary Service Commission network for a period of one year.

CLIENT: UNIVERSITY OF NAIROBI


PROBLEM:INSTALLATION AND COMMISSIONING OF LAN AT HYSLOP BUILDING

This was an old building without Network and no riser, and trunking. The power distribution boards were old with serious cases of short circuits. AMACEC resolved this and linked the Building to UON LAN through Fibre from the main Library. VLANS were created and it was a successful story for both department & Amacec despite numerous challenges encountered during implementation.

CLIENT: UNIVERSITY OF ELDORET


PROBLEM:Structured Cabling (DATA & VOICE)

Structured Cabling for School of Education.

CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:2. SUPPLY,INSTALLATION AND COMMISSIONING OF POWER UPGRADE OF KPC HQ

This upgrade was from the 11KV line to 66KV line. The scope involved supply, testing & commissioning of RMU, Transformer & LV Board. This has made the supply to be reliable and customer is very happy with upgrade.

CLIENT: KENOL KOBIL


PROBLEM:HI-LOW LEVEL ALARM GAUGING SERVICING/MAINTENANCE

HI-LOW level alarm Gauging servicing/Maintenance (H. There had been continuous fuel spillage at Nairobi Joint Depot due to failures of the tank gauging. Amacec was given task to service the tank service for the Eight (8) tanks which eliminated the spillage and failure of Hi/Low level alarms detection.

CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:SUPPLY, INSTALLATION & COMMISSIONING OF LOW VOLTAGE SWITCHGEAR & DRIVES FOR KPC PS27 ELDORET

This is an upgrade of the Low Voltage by integrating various distribution boards into one Motor Control Centre (MCC) to make control of motors more efficient

CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:INSTALLATION OF FIBRE CABLE FOR SIGNAL DETECTOR AND ASSOCIATED DEVICES FOR KPC PS27 ELDORET

This involved laying of Fibre cable from KPC Pipeline Chamber covering a distance of 2.9Km to Switch room. This was to offer solution for product interface detection by PLC at the control room

CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:INSTALLATION OF FIRE ALARMS AT KPC PUMP STATIONS (PS2/PS4/PS6/PS8)

This was to install Fire alarm sensor, Duty controller alarm alert incase of pump failure or system failure, and station Fire alarm

CLIENT: KENYA PIPELINE CORPORATION


PROBLEM:DESIGN,SUPPLY,INSTALLATION,TESTING AND COMMISSIONING OF WIFI COMMUNICATION SYSTEM FOR KPC HYDRANT MONITORING SYSTEM (HMS) FOR KPC PS9-JKIA AND KPC PS12-MIA

Enable communication between dispenser trucks and Hydrant Monitoring Software server for ease of Aircraft Fuel loading at the Airports.

CLIENT: KENYA CIVIL AVIATION AUTHORITY


PROBLEM:SUPPLY, INSTALLATION AND COMMISSIONING OF LOCAL AREA NETWORK FOR MLOLONGO TRANSMITTING STATION

Created Network and linked it through KCAA Headquarter through a Fibre backbone.

CLIENT: KENYA BUREAU OF STANDARDS


PROBLEM:STRUCTURED CABLING FOR DATA & VOICE FOR BLOCK B

Supply,installation and Commissioning of Data and voice

  • Maintenance of service of KEBS Headquarter
  • Structed Cabling of Nakuru Regional Offices
  • Structured Cabling of Garisa Regional office

CLIENT: TECHNICAL UNIVERSITY OF KENYA


PROBLEM:STRUCTURED CABLING AND CONFIGURATION OF ACCESS POINTS

  • Structured Cabling of Principal office
  • Supply, configuration of access points at the University hall for a conference
  • Supply of Siemon products

CLIENT: DEDAN KIMATHI UNIVERSITY OF TECHNOLOGY


PROBLEM:STRUCTURED CABLING

Structured cabling done.

CLIENT: KENYA SCIENCE TEACHERS COLLEGE


PROBLEM:SUPPLY,INSTALLATION AND COMMISSIONING OF LOCAL AREA NETWORK AT THE LABS

All project specifications completed according to company needs.

CLIENT: VVOB EDUCATION FOR DEVELOPMENT


PROBLEM:FULL NETWORK INSTALLATION

  • Supply,installation and Commissioning of Local Area Network for their HQ at National Bank
  • Ministry of Education (MOE) Data centre rehabilitation , Re-routing of cables and servicing
  • Ministry of Education (MOE) Local Area Network for service area
  • Supply, installation and Commissioning of Air Conditioners at SMASSE Kenya Science data centre.

SUB-CONTRACTS

MAIN CONTRACTOR :COMPUTECH LIMITED

MUMIAS SUGAR COMPANYLaying ,termination and testing of Campus Fibre for Mumias Sugar Company Limited linking all the buildings
MINI GROUP OF COMPANIES (SUPERLOAF)Laying, termination ,testing of Campus Fibre,Structured cabling for offices
GENERAL MOTORS EAST AFRICAUpgrade of Local Area Network for the entire offices,Laying ,termination,testing and Commissioning of Fibre for 8 Links
CITI BANK EATON HOUSE GIGIRIStructured cabling (Data,Voice & Video)
PRICE WATER HOUSE (PWC)Structured cabling for 9 Floors and Backbone Fibre
I & M BANKStructured Cabling (Malindi Branch) & (Nyeri Branch),Maintenance of Network I & M HQ Nairobi
ILRIPulling and termination of Fibre from server room to different locations
FORTIES SUITE HOPITAL HILL ROADStructured Cabling
FARMERS CHOICEStructured Cabling and pulling,termination,testing and Commissioning of Fibre links)
PKFStructured Cabling
JUDICIARY-RAHIMTULLAH BUILDING UPPER HILLStructured Cabling